PROJECT DATA

The New Bavarian Museum of History specifies high standards in safety and finish

Project: New Museum of Bavarian History in Regensburg, Germany

Contractor: Riedel Bau GmbH & Co. KG, Schweinfurt

Owner: Free State of Bavaria

MEVA Systems: Wall formwork Mammut 350, Safety system SecuritBasic, Slab formwork MevaFlex, Shoring system MEP, Foldable working platform BKB, Column formwork CaroFalt

Engineering: Riedel Bau

Support: MEVA Formwork- Systeme GmbH, Munich Branch, Germany

 
 
1
2
3
4
5
6
7
8
9
10
11
 

Project

Safety, Speed and High Quality Pours

Large building site in the Bavarian town of Regensburg, where work on the new Bavarian Museum of History is in full swing. The work is presided over by the Free State Construction Authority. The state government is investing a total of €67.3 million in the new museum on the Danube.

As part of the museum, the new socalled Bavariathek will convey the history of Bavaria as an innovative media archive. Construction work is scheduled to open in time for the Free State‘s 100th birthday in 2018.

One of the main reasons for the rapid progress of the construction work lies in the formwork and safety solutions for all wall, core, column and slab work as well as planning and support.

Top concrete finish with Mammut 350 and the alkus all-plastic facing
The Mammut 350 wall formwork system was used for the building‘s walls. With its large-format panels and the
high fresh-concrete pressure load of 100 kN/m², Mammut 350 enables high concrete walls to be poured quickly. Furthermore, the concrete surfaces were subject to stringent requirements, which were met without problem thanks to the series-production alkus all-plastic facing.

Safety in focus
Inherently safe, modular, and quickly assembled: With SecuritBasic, a modular system is available comprising of a safe access ladder, access hatches and a secure work platform. As the brace frames are attached to the rear of the work platform, the walkway is free of trip hazards and obstacles. Securit- Basic is assembled on the ground and brought into position by crane using a standard crane hook. The CaroFalt column formwork used here also has fully integrated safety equipment with an access ladder, a safety cage and a work platform. During the concrete pouring operations the tried-andtested BKB 125 foldable pouring platform once again proved its worth as a particularly simple, quick and effective
safety measure.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    Reservoirs with a capacity of 4.5 billion gallons are being built to increase the drinking water reserve

    As Qatar’s population and economy keep growing and water demand is increasing, the Qatar General Electricity & Water Corporation (KAHRAMAA) has launched an ambitious water project to provide increased water storage capacities and extend the supply reserve of drinking water from two to seven days.

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

  • A Brand-New Theater for the Cincinnati Shakespeare Company

    A Brand-New Theater for the Cincinnati Shakespeare Company

    The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.