Project: Sahara Tower 6 apartment complex at Al Nahda
Contractor: Al Thuriah Contracting
Principal: Rutter Immobiliengruppe, Vienna, Austria
MEVA system: Mammut 350 wall formwork system with alkus all-plastic facing and a load capacity of 100 kN/m²
Engineering and support: MEVA KHK Formwork Systems, Dubai, United Arab Emirates
Located between Sharjah and Dubai, close to Dubai International Airport, yet close to all amenities – Sahara Tower 6 is a residential tower offering luxury apartments with various bedroom configurations. The first block has 39 floors and the second block has 21, the facilities include a gym, a communal garden area and 24/7 security services for facility management. Al Thuriah is committed to high-quality construction and chose MEVA KHK’s comprehensive engineering services and rental formwork to complete expansive concrete works. The site relied on MEVA‘s heavy-duty wall formwork system Mammut 350 and its 100 kN/ m² load capacity to cope with the high pours and tightly scheduled pour cycles, which were planned and supported by the engineering team at MEVA KHK in Dubai.
Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction
One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.
The new theater is called The Otto M. Budig Theater and located in Cincinnati’s Over-The-Rhine district. When completed, it will become the last section of the planned “Classical Arts Corridor” in Cincinnati, which also includes a Music Hall, School for Creative and Performing Arts, and a park.
Children enjoy playing with it, teachers recommend it: the shape sorting box. Based on the popular toy, the architects who conceived the new Meséskert nursery designed the play areas on the top floor as a triangle, circle, and square.
MEVA Formwork Systems, Inc.
2000 Airpark Drive
Springfield, Ohio 45502
United States of America