PROJECT DATA

Development in the Heart of London

Project: Three 8-storey residential blocks with 74 apartments being built on the Chelsea Barracks site in central London

Architects: Squire & Partners, London

Contractor: Byrne Bros. Ltd.

MEVA Systems: Automatic climbing system MAC, AluStar wall formwork panels equipped with the all-plastic facing alkus

Engineering and support: MEVA Formwork Systems Singapore and Tamworth, UK

 

PROJECT

Chelsea Barracks: MAC climbing system and AluStar wall formwork on schedule

Chelsea Barracks were built in the 1860s in the area between Sloane Square and the Thames to house two battalions of troops. In the 1960s, the original Victorian buildings were replaced by two 13-storey concrete tower blocks. These were demolished to make way for new residential plans some years ago. After being sold, the area is now being developed. Three 8-storey towers with 74 apartments are being built on the site.

Contractor Byrne Bros. Ltd. once again chose the MAC automatic hydraulic system to climb the shafts. Project management is adhering to a tight, ambitious time schedule for concrete works and relies on the system’s proven advantages in terms of safety, efficiency, speed and quality. On the MAC platform, which is completely enclosed, AluStar panels are being used as hanging shutters. They are set up, moved and adjusted entirely by hand.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • A triumphant premiere: fish passes

    A triumphant premiere: fish passes

    The focus of MEVA's first collaboration with Austrian company GLS was nature conservation and the construction of two fish passes on the River Traun.

  • High above Manchester

    High above Manchester

    Four apartment buildings at heights up to 202 m by 2020: the city centre redevelopment project Deansgate Square. In use for a total of 194 storeys: the automatic MAC climbing system from MEVA

  • Reshoring over several levels

    Reshoring over several levels

    Uniting functions currently scattered across 30 locations, Zurich's new Police and Justice Centre (PJZ) will house the cantonal police force, the prosecution authorities as well as police detention and prison facilities.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.