PROJECT DATA

Residential development

with 211 appartments, 5 of them studios, trade and retail facilities.

Owner: SWICA Versicherungen AG, Winterthur and Swisscanto Anlagestiftung Asset Management, Zürcher Kantonalbank

Contractor: BAM Swiss AG, Basle

MEVA Systems: Wall formwork Mammut 350, Safety system SecuritBasic with wall formwork Mammut 350, Slab formwork MevaDec

Engineering and support: MEVA Formwork Systems, Seon (Switzerland) and Haiterbach (Germany)

 

PROJECT

The Swiss city of Winterthur is busy shaping its future

Visionary City Development

The former locomotive production factory known as „Loki“ in the middle of Winterthur is being redeveloped as a residential and commercial complex. The new buildings will house 211 appartments as well as various trade and retail facilities. Thanks to its central inner city location, the area is very easily accessible. Sustainable development is an important issue, following the strict Swiss “Minergie®” energy saving standard. Three new buildings are arranged around a spacious inner park. The varying building layouts required a meticulous approach to formwork and workflow planning.

Special board-style concrete finish in the staircase

The architects required a special board-style concrete surface in the staircase. This was achieved effectively and quickly by mounting a one-off plywood sheet onto the Mammut 350 wall formwork panels. The photo belows shows the dramatic effect achieved this way.

On site always on the safe side

The side opted for all-round safety provision during the entire building process. This included equipping the wall formwork Mammut 350 with the modular safety system SecuritBasic. It offers an all-around fall protection, safe and comfortable working platforms and access ladders. The push-pull props are attached to the back of the walkway bracket. They do not project from the working platform or planking, thus avoiding tripping obstacles.

Flexible adaptation to layouts

MevaDec slab formwork mastered the changing building layouts with a minimum of filler areas since it is not restricted to any fixed grid, making slab works easy and fast.

Poject manager Sander Thijssen of BAM Swiss AG says: “Particularly´the solution with plywood facing mounted onto the Mammut 350 to achieve the board-style concrete finish worked very well.“

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • A triumphant premiere: fish passes

    A triumphant premiere: fish passes

    The focus of MEVA's first collaboration with Austrian company GLS was nature conservation and the construction of two fish passes on the River Traun.

  • High above Manchester

    High above Manchester

    Four apartment buildings at heights up to 202 m by 2020: the city centre redevelopment project Deansgate Square. In use for a total of 194 storeys: the automatic MAC climbing system from MEVA

  • Reshoring over several levels

    Reshoring over several levels

    Uniting functions currently scattered across 30 locations, Zurich's new Police and Justice Centre (PJZ) will house the cantonal police force, the prosecution authorities as well as police detention and prison facilities.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.