PROJECT DATA

Challenge of tight schedules and very fast pours. Dragon Mart Extension, Dubai, United Arab Emirates

Contractor (and Architects): United Engineering Construction L.L.C., U.A.E.

MEVA Systems: Mammut 350, CaroFalt

Formwork Engineering: MEVA-KHK, Dubai

 
 
1
2
 

Project

Building for the Shopping Future

Extension aims to present a new Dragon Mart in Dubai

Dubai’s well known Dragon Mart is getting a face lift from its image as a Chinese mall with a new extension that aims to attract an international retail mix catering to the needs of the nearby International City community. Nakheel, the developer of Dragon Mart and master developer of International City, is aiming at a new presentation with a 177,000 m² extension to the mall. It will house a threestar hotel and multi-storey car park, a 10,000 m² Geant hypermarket, Grand Cinemas and fashion outlets.

Long-term MEVA client UNEC (United Engineering Construction L.L.C) relied on the formwork and substantial engineering support of MEVA-KHK’s operations in Dubai.

The engineers had to meet the challenge of tight schedules and very fast pours to finish the 155,000 m² of walls and 190 columns simultaneously. Especially the wall heights of up to 9 m and the column heights of up to 12 m required heavy-duty formwork.

The Mammut 350 fresh concrete load capacity of 100 kN/m² made it possible to pour at any speed up to a wall height of 4 m. The same capacity is delivered by the CaroFalt column formwork, which has the added benefit of being rolled from one pour to the next, making work flow simple and safe. In addition, the formwork’s standard 100 % wood-free, all-plastic facing delivered the required, superior concrete finish realiably in every pour. The panels were cleaned on site using a high-pressure 1,000 bar washer.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

  • High above Manchester

    High above Manchester

    Four apartment buildings at heights up to 202 m by 2020: the city centre redevelopment project Deansgate Square. In use for a total of 194 storeys: the automatic MAC climbing system from MEVA

  • South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    South Canal Bridge, Ontario: With no crane possible at busy Hwy 400, MevaLite handles the job with ease

    One of Ontario’s busiest transportation corridors, Highway 400, began a major expansion project through Kings Township in late 2016. This $79.3 million dollar (CAD) project includes the widening of the highway from three to six lanes in each direction for a two mile stretch and also entails safer on and off ramps, the expansion and realignment of culverts, and the replacement of two bridges − one of them the South Canal Bridge.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.