PROJECT DATA

Jazz Residences in Manila, Philippines:
Residential High-rise Building

Project: Residential High-rise housing block with partition walls inside.

Contractor: Megawide

MEVA Systems: Light-Weight Hand-Set Formwork AluFix, automatic climbing formwork system MAC

Formwork Engineering: MEVA Formwork Systems, Singapore

 
 
1
2
3
4
5
6
7
 

Project

Mass house building

A new method using MEVA’s wall formwork AluFix saves time and money

Modern homes are in increasing demand by the growing middle class in South East Asia and the Middle East. Building residential high-rises and housing blocks fast and efficiently without compromising quality or safety is a major challenge to local contractors in many Asian countries. The solution to the challenge is fast tracking the partition walls inside the buildings. MEVA’s crane-independent wall formwork system AluFix is extensively used for fast tracking because the panels can be carried manually and are ideally geared to the heights of partition walls. 

Fast-tracking partition walls eases the building process
How does fast-tracking work? First, the structural walls of a floor are erected, but no partition walls. Then, large panel areas of slab formwork are set up. This is done much faster than usually because there are no hindering inside walls. After pouring the slab and stripping the slab formwork, the partition walls on that floor are poured.

Sizes to fit any wall size
With four panels heights from 132 to 300 cm and over 10 widths from 20 to 75 cm per height, AluFix easily handles typical room heights and partition walls of any size and form. If the walls differ in height and width from standard sizes or from each other, the panels can be combined vertically and horizontally to reduce the panel selection to be held on stock on site. Standard fillers are available to bridge gaps. As the formwork for the partition walls extends to or almost to the poured slab, the concrete is poured through holes in the slab. If this is not possible, e.g. under RC beams, panels with filling nozzles are used for concrete pouring. 

The most efficient method with the best concrete surface
Subsequent partition walls can also be erected using hollow bricks, Spraycrete or Macro panels (prefabricated concrete hollow panels). Yet by using AluFix, contractors save efforts, time and costs for different reasons: no material (hollow bricks or Macro panels) needs to be transported, the concrete finish achieved with AluFix is much better than with hollow bricks and plastering work is minimised.

 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

  • A triumphant premiere: fish passes

    A triumphant premiere: fish passes

    The focus of MEVA's first collaboration with Austrian company GLS was nature conservation and the construction of two fish passes on the River Traun.

  • High above Manchester

    High above Manchester

    Four apartment buildings at heights up to 202 m by 2020: the city centre redevelopment project Deansgate Square. In use for a total of 194 storeys: the automatic MAC climbing system from MEVA

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.