PROJECT DATA

Superior Finish on 30’ High Walls for Limestone Storage Facility

Project: Limestone Storage Facility, Piqua Materials, Piqua, OH
Building size 130' x 84'

Contractor: Kapp Construction, Springfield, OH

MEVA Systems: Wall Formwork Imperial

Specifications: The MEVA Imperial formwork system was able to accommodate for the 30’ tall walls with multiple top of wall steps and buttresses. The main challenge with this project was using the external vibrators to ensure a quality concrete finish.

Engineering: MEVA Formwork Systems, Springfield, OH

 
 
1
2
 
  • MEVA Expertise & References

    MEVA Expertise & References

    Referencen for Projets in Commercial & Residential Construction, Architectural Construction, High-Rise Construction and Civil Engineering Construction

  • Challenging tunnel geometry

    Challenging tunnel geometry

    MEVA STB 450 offers flexible solution for narrow, inclined rail section: Near the municipality of Gretzenbach, the four-track route branches into two separate lines. Here, the two southern tracks gradually descend and pass below the cantonal road before entering the new Eppenberg Tunnel.

  • BIM: transparent and efficient

    BIM: transparent and efficient

    BIM stands for Building Information Modelling, a holistic, software-based method for optimised planning and execution of construction projects.

  • Plant-shaped viewing tower at Lake Velence

    Plant-shaped viewing tower at Lake Velence

    MEVA's StarTec and Radius wall formwork played a starring role in the construction of a 20 m tall, plant-shaped viewing tower, built by the shore of Lake Velence, south-west of Budapest.

All Plastic Facing alkus
MEVA Frame Profile
... more than just formwork
  •  Select language

    Select continent and country. Language selection optional.

  •  Contact
  •  Search

    Search on our website.

  •  Newsletter

    Subscribe to our monthly newsletter.